Tropic Supply Orlando: Heatcraft Refrigeration Equipment Installation and Troubleshooting for Contractors
December 2 @ 8:00 am - 12:00 pm
			ATTENDEED WILL LEARN:
Wiring diagrams and electrical best practices.
• Proper defrost timer setup and adjustment.
• Field piping best practices for proper capacity.
• Long line set best practices for proper oil return.
• Proper condensate drain piping and drain heater selection.
• Proper equipment placement and clearances.
• Common installation mistakes.
Light breakfast served 7am – 8am.
Registration is required, only 50 seats available.
Click HERE to register.
								

